We are focusing on exploring a new driving force for growth by concentrating
on diversification of business such as overseas resources development, engineering business etc.
Based on professional technical skills, we have performed the planned preventive maintenance for power generating
facilities since we were certified as a company eligible for maintenance of 5 power plants
and are registered as a partner for power plants and have actively performed construction and
the follow-up management with the best quality.
We have made the best effort for customer satisfaction on the basis of
every sort of machine tools and process technologies, diverse design experiences and know-how of constructing plants Kyungdong has.
No. | Equipment | Specification | Quantity | Client | Completed |
---|---|---|---|---|---|
8 | Power Plant Deck Installation | 2.2x3.3m etc. | 1 Lot | Korea East-West Power Co., Ltd. Donghae Bio Power | Jul 2018 |
7 | Bushing Chain part production | Link(190x425x125) etc. | 1 Lot | Korea East-West Power Co., Ltd. Donghae Bio Power | Jan 2018 |
6 | Compressor replacement | 80HPx2unit etc. | 1 Lot | Korea East-West Power Co., Ltd. Donghae Bio Power | Jan 2018 |
5 | Metropolitan Water Fog System | High-pressure pipe(100bar) | 1 Lot | Korea Southern Power Co., Ltd. Samcheok Power Division | Feb 2018 |
4 | Coal handling B/C Safety Facilities | Protection etc. | 1 Lot | Korea East-West Power Co., Ltd. Donghae Bio Power | Fab 2019 |
3 | Planned Preventive Maintenance | Silo 3A, 4A Replacement etc. | 1 Lot | Korea East-West Power Co., Ltd. Donghae Bio Power | Dec 2018 |
2 | Motor Disassemble & Convenience Facilities | Low pressure Motor etc. | 1 Lot | GS Donghae Power | Apr 2019 |
1 | Return Idler etc. | Ø140xL1,362mm etc. | 1 Lot | Korea East-West Power Co., Ltd. Donghae Bio Power | Apr 2018 |